Quality Management
Track inspections, manage defects, and maintain product quality standards.
4
Passed
2
Failed
3
Open Defects
2
Critical
Showing 8 of 8 inspections
| Inspection ID | Product | Work Order | Inspector | Type | Result | Date | Notes |
|---|---|---|---|---|---|---|---|
| INS-001 | Enclosure Pro X100 | WO-3345 | Lisa Park | Final | Pass | 2025-02-20 | All dimensions within tolerance. Surface finish grade A. |
| INS-002 | PCB Assembly v2.3 | WO-3346 | Mike Torres | In-Process | Fail | 2025-02-19 | Solder joint defects found on 12 out of 500 units. |
| INS-003 | Motor Assembly 24V | WO-3347 | Lisa Park | Incoming | Pass | 2025-02-18 | Raw material batch RB-4421 verified. Certificates match. |
| INS-004 | Sensor Kit Industrial | WO-3348 | Sarah Chen | Final | Pending | 2025-02-21 | Awaiting thermal cycling test results. |
| INS-005 | Gearbox Ratio 40:1 | WO-3350 | Mike Torres | In-Process | Pass | 2025-02-17 | Gear mesh tolerance verified. Noise level within spec. |
| INS-006 | Cable Harness Assembly | WO-3351 | Lisa Park | Incoming | Fail | 2025-02-16 | Wire gauge mismatch on 3 spools. Supplier notified. |
| INS-007 | Solar Panel Module 400W | WO-3349 | Sarah Chen | Final | Pass | 2025-02-15 | Output efficiency at 22.1%, exceeds minimum 21% requirement. |
| INS-008 | Custom Bracket Kit | WO-3356 | Mike Torres | In-Process | Pending | 2025-02-22 | Weld strength test samples sent to lab. |