Quality Management

Track inspections, manage defects, and maintain product quality standards.

4

Passed

2

Failed

3

Open Defects

2

Critical

Showing 8 of 8 inspections
Inspection IDProductWork OrderInspectorTypeResultDateNotes
INS-001

Enclosure Pro X100

WO-3345Lisa ParkFinalPass2025-02-20

All dimensions within tolerance. Surface finish grade A.

INS-002

PCB Assembly v2.3

WO-3346Mike TorresIn-ProcessFail2025-02-19

Solder joint defects found on 12 out of 500 units.

INS-003

Motor Assembly 24V

WO-3347Lisa ParkIncomingPass2025-02-18

Raw material batch RB-4421 verified. Certificates match.

INS-004

Sensor Kit Industrial

WO-3348Sarah ChenFinalPending2025-02-21

Awaiting thermal cycling test results.

INS-005

Gearbox Ratio 40:1

WO-3350Mike TorresIn-ProcessPass2025-02-17

Gear mesh tolerance verified. Noise level within spec.

INS-006

Cable Harness Assembly

WO-3351Lisa ParkIncomingFail2025-02-16

Wire gauge mismatch on 3 spools. Supplier notified.

INS-007

Solar Panel Module 400W

WO-3349Sarah ChenFinalPass2025-02-15

Output efficiency at 22.1%, exceeds minimum 21% requirement.

INS-008

Custom Bracket Kit

WO-3356Mike TorresIn-ProcessPending2025-02-22

Weld strength test samples sent to lab.